📣 Send us your press release
Site updates every 15 minutes
Technology

Aker Solutions secures engineering contract for Qatar oil field project

Aker Solutions has been awarded a contract by PTSC Mechanical and Construction to perform detailed design work for the Maydan Mahzam offshore redevelopment in Qatar.

5 November 2026

Norwegian engineering firm Aker Solutions received a letter of award from PTSC Mechanical and Construction (PTSC M&C) to provide detailed design services for the Maydan Mahzam oil field project. The offshore field, located in Qatar, is undergoing a redevelopment phase to maintain production capacity.

The scope of work involves technical engineering activities required for the project's infrastructure. While Aker Solutions classified the contract as 'sizeable'—typically ranging between 500 million and 1.5 billion Norwegian krone—the specific financial terms remain undisclosed.

This contract marks a continued involvement for Aker Solutions in Middle Eastern offshore energy projects. By partnering with PTSC M&C, the firm strengthens its engineering footprint in Qatar's upstream oil and gas sector. Work on the project is scheduled to proceed following the finalization of the contract terms.

Original source: prnewswire.com