📣 Send us your press release
Site updates every 15 minutes
Science

China unveils two-phase roadmap for Z-pinch fusion-fission heating pilot

Researchers have outlined a development plan for a Z-pinch fusion-fission hybrid reactor intended for industrial and municipal heating, with project completion targeted for 2035.

27 November 2026
China unveils two-phase roadmap for Z-pinch fusion-fission heating pilot
Image is an AI-generated illustration

A research team led by the Chinese Academy of Engineering has introduced an initial development plan for a Z-pinch fusion-fission hybrid demonstration reactor. The technology, which integrates fusion and fission processes, aims to provide a localized solution for municipal heating and industrial heat demands.

The project is divided into two distinct phases. The first phase, spanning 2026 to 2030, focuses on achieving fusion ignition and validating core technologies. This work will be centered at the 50MA electromagnetic-driven fusion facility in Chengdu, a national project currently under development by the Institute of Fluid Physics under the Chinese Academy of Engineering Physics.

The second phase, scheduled for 2031 to 2035, involves the construction of a pilot reactor with a projected fusion power of 200 megawatts and a thermal output exceeding 2000 megawatts. Beyond heating, the installation is designed to support material irradiation and the production of medical isotopes.

This initiative marks a shift toward practical applications for fusion-fission hybrid technology. By establishing a working pilot for heat delivery, researchers intend to build the technical foundation for future full-scale fusion energy power generation.

Original source: ithome.com