Dulles Airport Update: Trump Claims Role in Final Design
Plans for a significant update to Dulles International Airport outside Washington D.C. have been revealed. U.S. President Donald Trump has stated he personally influenced the final design of the modernization project.

Questions have arisen regarding the authorship of the design for the $22.5 billion modernization project at Dulles International Airport. U.S. President Donald Trump announced in late July that he personally influenced the outcome of the airport's modernization plan.
Initially, over 30 global architectural firms submitted proposals to the U.S. Department of Transportation for the airport's revitalization. These included firms such as HNTB, AECOM, Zaha Hadid Architects, and Grimshaw. A single plan was ultimately presented, but its specific designer was not clearly identified during the project's announcement.
Trump himself stated at a White House briefing that he had selected elements from the various submitted designs. Transportation Secretary Sean Duffy described the project as a compilation of Trump's best ideas, noting the president had used his "building skill" to shape the plan. United Airlines CEO Scott Kirby was also mentioned as having been significantly involved.
Airport authorities have provided limited details on the design's authorship, stating that further information will be released as the project progresses. Trump has previously shown considerable interest in reshaping Washington D.C.'s built environment. He has publicly criticized Dulles Airport as "really horrible" and "impossible," specifically targeting the mobile lounges used for passenger transport and proposing their replacement with an underground rail system and pedestrian tunnels.
The modernization plan intends to preserve the original 1962 terminal designed by Eero Saarinen, though new structures will be added. Trump claims the update will be financed primarily by the airport's own funds and completed within two years, with construction set to begin in spring 2027.