Main structure of Chengdu railway station reaches completion
Construction on the main structure of the Chengdu railway station has finished, shifting the project into interior fit-outs as part of the new high-speed rail link between Chengdu and Chongqing.

The China State Railway Group has announced the completion of the structural framework for the upgraded Chengdu railway station. Following the final installation of the steel roof grid, the project has transitioned to interior finishing and equipment installation phases. The station, first opened in 1952, is undergoing a major transformation to serve as the hub for the upcoming high-speed rail line.
The expansion project increases the station's scale from 12 to 18 tracks. The design utilizes an elevated passenger waiting area and a multi-layered terminal layout to maximize efficiency within the constraints of the city center. Construction has faced logistical complexities due to the proximity of existing municipal subway lines.
Upon completion, the Chengdu-Chongqing high-speed railway—a 292-kilometer line designed for speeds of 350 km/h—is expected to reduce travel time between the two cities to 50 minutes. The development aims to streamline regional transit and support the integrated economic growth of the Chengdu-Chongqing metropolitan area.