📣 Send us your press release
Site updates every 15 minutes
Manufacturing

Outokumpu supplies stainless steel for Sagrada Família construction

Since 2013, Outokumpu has been the primary supplier of stainless steel for the ongoing construction of the Sagrada Família basilica in Barcelona.

4 November 2026
Outokumpu supplies stainless steel for Sagrada Família construction

Finnish stainless steel producer Outokumpu has been providing specialized steel products, including rebar, bars, and machined components, for the Sagrada Família basilica since 2013. These materials are primarily integrated into the structure of the basilica’s 18 towers, which range in height from 94 to 182 meters.

Stainless steel was specified for the project due to its corrosion resistance and structural strength, essential for minimizing long-term maintenance in a demanding urban environment. Given the high volume of visitors to the UNESCO World Heritage site, the project requires strict logistical management, with Outokumpu coordinating deliveries to align with the basilica's construction schedule.

Project representatives noted that the cooperation involves ongoing technical consultation regarding structural integrity and material performance. The basilica’s construction, which began in 1882, is currently scheduled to reach completion in 2026.

Original source: outokumpu.com