📣 Send us your press release
Site updates every 15 minutes
Construction

Reykjavik to open shared street Naustin in December

The city of Reykjavik is finalizing the conversion of Naustin into a shared street space. The project includes major utility upgrades and is scheduled to open this December.

3 November 2026
Reykjavik to open shared street Naustin in December
Image is an AI-generated illustration

Reykjavik City and Veitur Utilities are completing the reconstruction of Naustin, which will open as a shared street this December. The project aligns with the approved traffic plan for the Kvosin district, designed to integrate vehicle and pedestrian movement within a unified corridor.

The project involved significant infrastructure improvements, including the replacement of utility lines and the installation of a dual municipal sewer system to enhance stormwater drainage. To ensure year-round accessibility, a snowmelt heating system has been installed throughout the street.

Designed by Landmótun, the new street features a level surface with integrated greenery, tree beds, and a multipurpose stage area. Lota managed the lighting design, utilizing mast-style lamp posts intended to improve pedestrian safety and visibility. The street serves as a connector between Hafnarstræti and Tryggvagata.

Original source: reykjavik.is